3711 AR-355

Building

Building 3711 AR-355

Fulton, AR, USA

John W. Turk Power Plant, AEP John W. Turk, Jr. Unit 1 Power Plant

Details

Icon-transparency Transparency

This building has an 8 year timeline with 3 green activities including a LEED Silver certification.

Timeline

John W. Turk Power Plant
reported on 08/13/2016
GHG Emissions Reported
EPA GHG Reporting Program (2015)

Resources

Building Details

Owner Type(s) Profit Org.
Space Type(s) Industrial Manufacturing
CBSA Hope, AR
USGBC Chapter Arkansas Chapter
EPA Region South Central
NHCS Urban Rural Classification Micropolitan (nonmetropolitan)
ghg quantity reported metric tons co2 2849846
Report a Data Problem