Charleston International Airport (CHS)

Building

Building Charleston International Airport (CHS)

5500 International Blvd, Charleston, SC, USA

Boeing CHS Final Assembly Building

Details

Icon-transparency Transparency

This building has a 3 year timeline with 2 green activities including a LEED Gold certification.

Timeline

Boeing CHS Final Assembly Building
registered on 01/24/2010
Registered
LEED NC 2009

Walk Score®: 0/100

Resources

Building Details

Owner Type(s) Corporate: Publicly Traded
Space Type(s) Industrial Manufacturing
CBSA Charleston-North Charleston-Summerville, SC
USGBC Chapter South Carolina Chapter
EPA Region Southeast
NHCS Urban Rural Classification Medium metro
Report a Data Problem