750 Gateway Blvd

Building

Building 750 Gateway Blvd

South San Francisco, CA, USA

Gateway of Pacific Phase II, ASF23, Biomed Realty GOP2 Forum + 1 more

Details

Icon-transparency Transparency

This building has a 5 year timeline with 7 green activities including a LEED Gold certification.

Timeline

Amgen San Francisco (ASF)
reported on 04/27/2023
Registered
Zero Waste v1
Biomed Realty GOP2 Forum
awarded on 04/25/2023
Gold
LEED v4 ID+C CI
Gateway of Pacific Phase II
awarded on 01/25/2023
Gold
LEED v4 BD+C CS
ASF23
awarded on 12/14/2022
Gold
LEED v4 ID+C CI
Biomed Realty GOP2 Forum
registered on 12/08/2021
Registered
LEED v4 ID+C CI
ASF23
registered on 06/18/2020
Registered
LEED v4 ID+C CI
Gateway of Pacific Phase II
registered on 05/14/2019
Registered
LEED v4 BD+C CS

Walk Score®: 47/100

Resources

Building Details

Owner Type(s) Corporate: Publicly Traded, Corporate: Privately Held
Space Type(s) Laboratory, Public Assembly
CBSA San Francisco-Oakland-Fremont, CA
USGBC Chapter Northern California Chapter
EPA Region Pacific Southwest
NHCS Urban Rural Classification Large fringe metro
Report a Data Problem