4 Chapel Rd Bldg 4

Building

Building 4 Chapel Rd Bldg 4

Yona,, Guam

Lockwood Terrace Phase II

Details

Icon-transparency Transparency

This building has a 4 year timeline with 6 green activities.

Timeline

Lockwood Terrace Phase II
awarded on 01/10/2018
Gold
LEED-HOMES v2008
Lockwood Terrace Phase II
awarded on 01/10/2018
Gold
LEED-HOMES v2008
Lockwood Terrace Phase II
awarded on 01/10/2018
Gold
LEED-HOMES v2008
Lockwood Terrace Phase II
registered on 08/14/2015
Registered
LEED-HOMES v2008
Lockwood Terrace Phase II
registered on 08/14/2015
Registered
LEED-HOMES v2008
Lockwood Terrace Phase II
registered on 08/14/2015
Registered
LEED-HOMES v2008

Walk Score®: 27/100

Resources

Building Details

Space Type(s) Single-Family Home
Report a Data Problem