625 Av. Sainte-Croix

Building

Building 625 Av. Sainte-Croix

Saint-Laurent, QC, Canada

Construction du pavillon de l'eau

Details

Icon-transparency Transparency

This building has a 1 year timeline with 1 green activity.

Timeline

Construction du pavillon de l'eau
registered on 12/16/2022
Registered
LEED v4 BD+C NC

Resources

Building Details

Owner Type(s) Educational: College, Public
Space Type(s) Laboratory
Report a Data Problem