Oberneuhofstrasse 3

Building

Building Oberneuhofstrasse 3

Baar, Switzerland

Kirkbi Neubau Baar

Details

Icon-transparency Transparency

This building has a 1 year timeline with 1 green activity.

Timeline

Kirkbi Neubau Baar
registered on 01/12/2024
Registered
LEED v4 BD+C CS

Resources

Building Details

Owner Type(s) Non-Profit (that do not fit into other c
Space Type(s) Office
Report a Data Problem