Paseo y Av. 24 de mayo sector Colinas de

Building

Building Paseo y Av. 24 de mayo sector Colinas de

Cuenca, EC010210, EC

Wayra Plaza, Megamaxi Wayra

Details

Icon-transparency Transparency

This building has a 4 year timeline with 4 green activities including a LEED Gold certification.

Timeline

Wayra Plaza
awarded on 02/06/2025
Gold
LEED v4 BD+C CS
Megamaxi Wayra
awarded on 01/16/2025
Gold
LEED v4 ID+C Retail
Megamaxi Wayra
registered on 01/11/2022
Registered
LEED v4 ID+C Retail
Wayra Plaza
registered on 01/11/2022
Registered
LEED v4 BD+C CS

Resources

Building Details

Owner Type(s) Corporate: Privately Held
Space Type(s) Retail
Report a Data Problem