4610 Buckeye Road

Building

Building 4610 Buckeye Road

Palmetto, FL, USA

Gulfstream Station 420, GULFSTREAM STATION 420

Details

Icon-transparency Transparency

This building has a 7 year timeline with 5 green activities.

Timeline

GULFSTREAM STATION 420
reported on 08/13/2016
GHG Emissions Reported
EPA GHG Reporting Program (2015)
Gulfstream Station 420
reported on 01/01/2013
GHG Emissions Reported
EPA GHG Reporting Program (2013)
Gulfstream Station 420
reported on 01/01/2012
GHG Emissions Reported
EPA GHG Reporting Program (2012)
Gulfstream Station 420
reported on 01/01/2011
GHG Emissions Reported
EPA GHG Reporting Program (2011)
Gulfstream Station 420
reported on 01/01/2010
GHG Emissions Reported
EPA GHG Reporting Program (2010)

Resources

Building Details

CBSA North Port-Bradenton-Sarasota, FL
USGBC Chapter Florida Gulf Coast Chapter
EPA Region Southeast
NHCS Urban Rural Classification Medium metro
Utility Provider Peace River Electric Coop, Inc.
industry type sectors Petroleum and Natural Gas Systems
total reported direct emissions in metric tons co2e 45,919 , 50,340 , 46,822 , 49,948
note Emissions data reported to EPA as of 8/18/2014
ghg quantity reported metric tons co2 49256
Report a Data Problem