Portside

Building

Building Portside

Cape Town, SA

Details

Icon-transparency Transparency

This building has a 1 year timeline with 1 green activity.

Timeline

Portside
reported on 06/01/2013
Case Study
Green Star SA Case Studies

Resources

Building Details

project area in sq meters 68940
rating program Green Star SA office v1 Design
rating 5 Star
total points 67
Report a Data Problem