Lockwood Terrace Phase I

Building

Building Lockwood Terrace Phase I

GU

Details

Icon-transparency Transparency

This building has a 1 year timeline with 1 green activity.

Timeline

Lockwood Terrace Phase I
registered on 08/20/2014
Registered
LEED-HOMES v2008

Resources

Building Details

Report a Data Problem